Marine Industry Facility Study
When our client was considering the purchase of two large existing marinas they needed to have both facilities studied in order to determine each structures' condition, suitability and cost of rehabilitation in order to transform the properties into a unified repair facility for Coast Guard vessels.
Within a short two-week period we inspected 20 facility structures and then produced a detailed 188 page report which included key plans for each building, identification of key findings, recommendations for repair or replacement and opinions of probable construction costs. This document proved to be a valuable tool in the acquisition of the facilities and formed the basis of facilities planning post-purchase.